What we initially thought would be completed by Christmas is a long way from being done! Here's what Charlie's bathroom looks like right now:
And here are some shots of the master:
A view of the shower with half wall
A view of the shower with half wall
Soaker air-jet tub with heated backrest woohoo!
(she's not there permanently, but will be soon)
(she's not there permanently, but will be soon)
View from door way
On the docket this short holiday week are some plumbing and insulating.
Next week sheetrock and taping and then maybe tile after that?
The space is going to be tight with two sinks and vanities and medicine cabinets and a skinny linen closet tossed in there beside the tub, but we need to make the most of the square feet we have. Oh, and I am getting my wish (re: All I want for Christmas is a working toilet) just in time for my Mom to visit for Christmas!